Silicon CPV Ltd
Akhter House, Perry Road, Harlow, Essex, CM18 7PN, UK
Tel +44 (0) 1279 821200 Email [email protected]
Page 2 of 24
Document Revision Control
Revision
Date
Comments
1.4
25
th
May 2016
Update XL G2
1.6
23rd January 2018
Reformatted, new images
for new boosters, updated
for G2
1.7
19
th
October 2018
Added Booster panel
positioning diagram.Edited
battery removal process
for G2.
Disclaimer
This document is the property of Silicon CPV and therefore cannot be copied
or edited in any way without prior and written permission from Silicon CPV.
Unpacking - Box Contents
Please take care as one of the key components of the Solar Street Light is
the Solar Panel that is protected via a toughened glass panel.
Please unbox the Solar Street Light and very carefully inspect the light to
check that there has been no damage to the Light during transportation.