Instruction Manual StackGuard
10266E/1
9
3
Installation/Start-up
3.1
Important information when installing the
measuring system
The purge air blower must be sized so that a purge air quantity of 12..16
l/min. is guaranteed under all pressure conditions in the measuring cell.
A coarse filter must be installed before the purge air blower.
The cooling section must be installed between purge air blower and purge
air filter. Its purpose is to cool down the purge air that is heated by the
compression of the purge air blower.
At an ambient temperature of 50°C, the purge air temperature at the
purge air filter must not exceed 50°C!