Mounting / Installing / Connecting
4.2 Preparation before assembly
VersiCharge AC Wallbox IEC
24
Operating Instructions, 03/2021, A5E50366109-AA
4.2
Preparation before assembly
Requirements
•
Follow country-specific statutory installation requirements.
•
Installation site:
–
The wall is even and load-bearing
–
When mounting on a column or anywhere else, observe the applicable notes on
installation and mounting information
•
The power supply connection is available.
•
All power supply connections are de-energized and secured against unintentional
reconnection.
Required tools
The required tools are not included in the scope of delivery.
•
SW 36 open-ended wrench
•
Optional cable gland
•
Phillips head screwdriver set
•
Slotted screwdriver set
•
Torx TR screwdriver set
•
Tool set for electricians
•
Spirit level
•
If applicable, Crimp and mounting tool for RJ45 plug
Tools for stone wall or concrete wall:
•
Impact drill
•
Masonry drill
∅
8 mm
•
Hammer
Summary of Contents for VersiCharge
Page 1: ......