
9. Partially open the differential pressure valve
④
until liquid escapes without bubbles.
10.Close the differential pressure valve.
11.Close the vent valve (sealing plug with vent valve) on the negative side of the pressure
transmitter.
12.Open the differential pressure valve
③
with half a revolution.
13.For a lower range value of 0 bar, check the zero point (4 mA) and correct the lower range
value if it is different.
14.Close the stabilizing valve
②
.
15.Open the differential pressure valves (
③
and
④
) completely.
8.5.2.3
Commissioning with vapor
Requirement
All valves are closed.
WARNING
Hot vapor
Danger of injury or damage to device.
If the shut-off valves
⑥
and the differential pressure valve
③
are both open and the stabilizing
valve
②
is then opened, the pressure transmitter
①
can be damaged by the flow of vapor.
● Follow the specified procedure for commissioning.
WARNING
Hot vapor
Danger of injury.
You can briefly open the drain valves
⑦
to clean the line. Hot vapor can escape in the process.
● Only open the drain valves
⑦
briefly, and close them again before vapor escapes.
Commissioning
8.5 Application examples
SITRANS P320/P420 with 4 to 20 mA/HART
98
Operating Instructions, 11/2019, A5E44852162-AC