233
7UM61 Manual
C53000-G1176-C127-3
Mounting and Commissioning
3
This chapter is intended for experienced commissioning staff. They should be familiar
with the commissioning of protection and control equipment, with operation of the
power system network and with the safety rules and regulations. Certain adaptations
of the hardware to the power system specifications may be necessary. For primary
testing, the object to be protected (generator, motor, transformer) must be started up
and in put into service.
Mounting and Connections
Checking Connections
Commissioning
Final Preparation of the Device
www
. ElectricalPartManuals
. com