8-1
7SA522 Manual
C53000-G1176-C119-2
Installation and Commissioning
8
This section is primarily for personnel who are experienced in installing, testing, and
commissioning protective and control systems, and are familiar with applicable safety
rules, safety regulations, and the operation of the power system.
Installation of the 7SA522 is described in this section. Hardware modifications that
might be needed in certain cases are explained. Connection verifications required be-
fore the device is put in service are also given. Commissioning tests are provided.
Some of the tests require the protected object (line, transformer, etc.) to carry load.
Summary of Contents for siprotec 7SA522
Page 20: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 64: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 89: ...SIPROTEC 4 Devices 4 25 7SA522 Manual C53000 G1176 C119 2 Figure 4 20 CFC Logic example ...
Page 408: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 456: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 516: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 620: ...Appendix B 48 ...