
Maintenance and troubleshooting
8.3 Maintenance
SIPROCESS UV600
Operating Instructions, 10/2013, A5E03529375-02
161
8.3.1
Maintenance carried out by user
Overview
Table 8- 1
Maintenance work carried out by user
Maintenance interval
Work
D*
W*
M*
6M*
(x) x
x
x
Visual inspection
(x)
x
x
Calibration
x
x
x
Check/clean gas inlet and outlet lines
x
Check operating hours of UV lamp
* Explanations: D = daily, W = weekly, M = monthly, 6M = six-monthly
Visual inspection
We recommend a visual inspection at least every 2 days. The following points should be
checked:
●
Display / logbook of maintenance requests and fault messages
●
Calibration gas supply: remaining pressure, status of gas line and associated valves
●
Gas preparation (if present): state of individual components.
Cleaning the enclosure
Observe the following when cleaning the enclosure:
●
Only use a soft, lint-free cloth for cleaning.
●
Moisten the cloth if necessary and use a mild detergent.
●
Never use mechanically or chemically aggressive cleaning agents!
●
Make sure that no liquid can penetrate the analyzer.
WARNING
Moisture in the analyzer
If liquid has penetrated the analyzer, it may no longer function. In this case:
•
Do not touch the analyzer!
•
Immediately interrupt the power supply and gas supply!
•
Inform the customer service department.