Chronological sequence
Reference point approach with incremental measuring systems can be divided into three phases:
• Phase 1: Traversing to the reference cam
• Phase 2: Synchronization with the zero mark of the position measuring system (encoder zero mark)
• Phase 3: Traversing to the reference point
Figure 15-2
Time sequence when referencing with incremental measuring systems (example)