3.6.11.7
Acceptance certificate
Factory No. (see rating plate)
N-
End customer
❑
Connecting cable between the delivery units is plugged in from transfer
module =.T-X111 to transfer module =.T-X211
❑
External wiring (mushroom pushbutton / activation, circuit breaker) is in ac‐
cordance with the circuit overview (section "Circuit overview")
❑
The requirements for mushroom pushbutton / activation are fulfilled (see
section "Description" for the requirements)
❑
The equipment is visible from the site of acknowledgement
❑
The requirements for circuit breakers are fulfilled (see section "Description"
for the requirements)
❑
Set delay time for safety relay -K110
_______ seconds
Set delay times for time relay -K120
_______ seconds
Tripping level of voltage monitoring relay -A11 checked (25.2 V - 26.4 V).
(For test steps, see "Commissioning", section "Checking voltage monitoring
relay -A11")
❑
"Safe Torque Off" function test executed. (For test steps, see "Commission‐
ing", section ""Safe Torque Off" function test")
❑
Log completion and countersignatures
The points listed in the acceptance certificate are hereby confirmed
Commissioning engineer
Date
Name
Company/dept.
Signature
Machine manufacturer or authorized department
Date
Name
Company/dept.
Signature
Description
3.6 Description of options
SINAMICS SM150 6SL3845-7NN46-7AA0
70
Operating Instructions 04/2017
Summary of Contents for SINAMICS SM150
Page 2: ...20 04 2017 13 53 V27 00 ...
Page 14: ...Table of contents SINAMICS SM150 6SL3845 7NN46 7AA0 14 Operating Instructions 04 2017 ...
Page 122: ...Start up SINAMICS SM150 6SL3845 7NN46 7AA0 122 Operating Instructions 04 2017 ...
Page 190: ...Maintenance 9 7 Repairs SINAMICS SM150 6SL3845 7NN46 7AA0 190 Operating Instructions 04 2017 ...
Page 192: ...Spare parts SINAMICS SM150 6SL3845 7NN46 7AA0 192 Operating Instructions 04 2017 ...
Page 196: ...Service Support SINAMICS SM150 6SL3845 7NN46 7AA0 196 Operating Instructions 04 2017 ...
Page 217: ......