![Siemens SINAMICS PERFECT HARMONY GH150 6SL3826 Operating Instructions Manual Download Page 112](http://html.mh-extra.com/html/siemens/sinamics-perfect-harmony-gh150-6sl3826/sinamics-perfect-harmony-gh150-6sl3826_operating-instructions-manual_378209112.webp)
Figure 9-9
Removing a power cell
Installing a power cell
Execute the steps described in the section "Removing the power cell" in the reverse order.
Final checks
1. Make sure that all the screws have been tightened with the correct torques.
NOTICE
Damage and/or short-circuits at the double submodules caused by an incorrect tightening
torque
If you do not comply with the screw tightening torques, then this can lead to damage and/
or short-circuits at the power cells.
● When installing the power cells comply with the specified torques.
Screw type
Torque
M4
1.8 Nm
M5
3 Nm
For the M5 x 25 screws of the upper holding rail, a torque of 6 Nm
must be used (see step 4 of the description on removing).
M8
13 Nm
Maintenance
9.7 Repair
SINAMICS PERFECT HARMONY GH150 6SL3826
112
Operating Instructions 05/2020
Summary of Contents for SINAMICS PERFECT HARMONY GH150 6SL3826
Page 2: ...19 06 2020 09 25 V14 00 ...
Page 120: ...Spare parts SINAMICS PERFECT HARMONY GH150 6SL3826 120 Operating Instructions 05 2020 ...
Page 124: ...Service Support SINAMICS PERFECT HARMONY GH150 6SL3826 124 Operating Instructions 05 2020 ...
Page 130: ...Quality documents SINAMICS PERFECT HARMONY GH150 6SL3826 130 Operating Instructions 05 2020 ...
Page 135: ......