
6.5.11
Fastening the cable ducts with cable ties
Fasten all cable ducts whose cover faces downward with cable ties. Wind the cable ties around
the entire cable duct. The cable ties must be located at the same positions as in the delivered
state.
Figure 6-10 Schematic diagram: Fastening the cable ties
Electrical connection
6.5 Connection
SINAMICS GM150 6SL3815-2LN41-4AA2
116
Operating Instructions 04/2017
Summary of Contents for SINAMICS GM150
Page 2: ...20 04 2017 13 25 V27 00 ...
Page 16: ...Table of contents SINAMICS GM150 6SL3815 2LN41 4AA2 16 Operating Instructions 04 2017 ...
Page 228: ...Spare parts SINAMICS GM150 6SL3815 2LN41 4AA2 228 Operating Instructions 04 2017 ...
Page 232: ...Service Support SINAMICS GM150 6SL3815 2LN41 4AA2 232 Operating Instructions 04 2017 ...
Page 256: ...Index SINAMICS GM150 6SL3815 2LN41 4AA2 256 Operating Instructions 04 2017 ...
Page 257: ......