
7. Insert the battery pack
③
.
Figure 5-11 Install battery
8. To reinstall the uninterruptible power supply, perform steps 2 to 6 in reverse order.
9. Remove the "UPS without battery pack" label from the converter.
Installation
5.11 Installing the battery of the uninterruptible power supply
SINAMICS GM150 6SL3815-2LN41-4AA2
100
Operating Instructions 04/2017
Summary of Contents for SINAMICS GM150
Page 2: ...20 04 2017 13 25 V27 00 ...
Page 16: ...Table of contents SINAMICS GM150 6SL3815 2LN41 4AA2 16 Operating Instructions 04 2017 ...
Page 228: ...Spare parts SINAMICS GM150 6SL3815 2LN41 4AA2 228 Operating Instructions 04 2017 ...
Page 232: ...Service Support SINAMICS GM150 6SL3815 2LN41 4AA2 232 Operating Instructions 04 2017 ...
Page 256: ...Index SINAMICS GM150 6SL3815 2LN41 4AA2 256 Operating Instructions 04 2017 ...
Page 257: ......