5.4
Quick commissioning using the BOP-2 operator panel
5.4.1
Fitting the BOP-2 to the converter
Fitting the BOP-2 to the converter
Procedure
1. Open the cover of the interface X21 on the front of the Control Unit.
2. Locate the lower edge of the Operator Panel into the matching recess of the Control Unit.
3. Plug the operator panel BOP-2 onto the converter until the latch audibly engages.
You have plugged the BOP-2 onto the converter.
❒
The operator panel BOP-2 is ready for operation when you connect the converter to the power
supply.
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
SINAMICS G120XA converter
110
Operating Instructions, 03/2019, FW V1.0, A5E44751205B AB