Commissioning
4.3 Commissioning with factory settings
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
67
Pre-assignment of the terminal strip for the CU240E-2 DP and CU240E-2 DP-F
)DXOWDFNQRZOHGJPHQW
)L[HGVSHHGVHWSRLQWVHOHFWLRQ%LW
9SRZHUVXSSO\
)L[HGVSHHGVHWSRLQWVHOHFWLRQ%LW
)L[HGVSHHGVHWSRLQWVHOHFWLRQ%LW
'ULYHIDXOWDFWLYH
$ODUPSUHVHQW
2SHUDWLRQHQDEOHG
6ZLWFK
DFNQRZOHGJHPHQW
'LVSOD\
$FWXDOIUHTXHQF\
6LJQDOODPSV
)DXOWV
$ODUPV
2SHUDWLRQ
'3DGGUHVV
352),%86'3
9
*1'
$,
$,
',
',
',
',
89
$,
$,
$2
*1'
702725
702725
',
',
'21&
'212
'2&20
'2
'2
'21&
'212
'2&20
$2
*1'
*1'
9,1
*1',1
',&20
',&20
Figure 4-6
CU240E-2 DP and CU240E-2 DP-F: Wiring example for the factory settings
Note
Assignment of the terminal strip after basic commissioning
The CU240E-2 DP (F) Control Unit is assigned in the same way as the CU240E-2 (F)
(without PROFIBUS interface) when you deselect bus communication for both the command
sources and the setpoint value specification during basic commissioning of the inverter.