7U
DQ
VI
RU
P
HU
0RXQWLQJSODWH
)RXQGDWLRQ
)RXQGDWLRQ
(TXLSRWHQWLDOERQGLQJ
)XVHVVZLWFKHVDQG
FRQWDFWRUV
/LQHILOWHU
,QYHUWHU
2XWSXWUHDFWRURU
VLQHZDYHILOWHU
&RQWUROFDELQHW
&RQWUROFDELQHW
'ULYHQPDFKLQH
6KLHOGVXSSRUW
(OHFWULFDOO\
FRQGXFWLYH
FRQQHFWLRQV
WKURXJKDODUJH
VXUIDFHDUHD
3(
3(
3(
3(
/
1
/
/
Figure 4-2
Grounding and high-frequency equipotential bonding measures in the control cabinet and
in the plant/system
Further information
Additional information about EMC-compliant installation is available in the Internet:
EMC installation guideline (
https://support.industry.siemens.com/cs/ww/de/view/60612658/
)
4.2.2
Cables
Cables with a high level of interference and cables with a low level of interference are
connected to the inverter:
● Cables with a high level of interference:
– Cable between the line filter and inverter
– Motor cable
– Cable at the inverter DC link connection
– Cable between the inverter and braking resistor
● Cables with a low level of interference:
– Cable between the line and line filter
– Signal and data cables
Installing/mounting
4.2 EMC-compliant installation of a machine or system
Power Module PM240-2
28
Hardware Installation Manual, 08/2017, A5E33294624B AG