Advanced commissioning
6.12 Setpoints
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF
163
Who may perform the acceptance test of the inverter?
Personnel from the machine manufacturer, who, on account of their technical qualifications
and knowledge of the safety functions, are in a position to perform the acceptance test in the
correct manner are authorized to perform the acceptance testing of the inverter.
Wizard for the acceptance test
The "Startdrive Advanced" commissioning tool (requires an appropriate license) includes a
wizard for the acceptance test of the safety functions integrated in the drive.
"Startdrive Advanced" guides you through the acceptance test, generates the appropriate
traces to analyze the machine response – and generates an acceptance report as Excel file.
Further information is provided on the Internet:
Startdrive, system requirements and download
https://support.industry.siemens.com/cs/ww/en/view/109752254
6.11.3.8
Reduced acceptance test after function expansions
Reduced acceptance test after function expansions
A full acceptance test is necessary only after first commissioning. A reduced acceptance test
is sufficient when safety functions are expanded.
Measure
Acceptance test
Acceptance test
Documentation
Functional expansion of the ma-
chine (additional drive).
Yes.
Only check the safety
functions of the new
drive.
•
Supplement machine overview
•
Supplement inverter data
•
Add function table
•
Log the new checksums
•
Countersignature
Transfer of inverter settings to
other identical machines by means
of series commissioning.
No.
Only check the control
of all of the safety
functions.
•
Add machine description
•
Check checksums
•
Check firmware versions
6.12
Setpoints
6.12.1
Overview
The inverter receives its main setpoint from the setpoint source. The main setpoint generally
specifies the motor speed.