
SLB - SIMOLINK Board
08.2000
Connecting-up
Siemens AG 6SE7087-6NX84-0FJ0
SIMOVERT MASTERDRIVES
Operating Instructions
4-1
4
Connecting-up
The SLB optional board is provided with
♦
two connections for SIMOLINK and
♦
one connection for the external voltage supply
4.1
Connecting SIMOLINK
Two connections for the fiber-optic cables are available for SIMOLINK, one
input and one output respectively.
You must always connect SIMOLINK up to both connections.
!
CAUTION
If you confuse the two connections for signal input and signal output,
SIMOLINK cannot operate.
Connecting
SIMOLINK