Assembly
5.2 Preparing for installation
1MB..1/2/3/4 - shaft heights 63 ... 355
54
Operating Instructions, 06/2020, A5E44455710A
Loss of conformity with European directives
In the delivery state, the machine corresponds to the requirements of the European
directives. Unauthorized changes or modifications to the machine lead to the loss of
conformity with European Directives and the loss of the associated warranty.
Explosion hazard when making modifications to the machine
Substantial modifications to the machine are not permitted – or may only be performed by
the manufacturer. Otherwise an explosion can occur in an explosive atmosphere. This can
result in death, serious injury or material damage.
●
If necessary, please contact the service center.
5.2
Preparing for installation
5.2.1
Requirements for installation
The following requirements must be satisfied prior to starting installation work:
●
Staff have access to the operating and installation instructions.
●
The machine is unpacked and ready for mounting at the installation location.
●
Measure the insulation resistance of the winding before starting any installation work. If
the insulation resistance lies below the specified value, take appropriate remedial
measures. These remedial measures may necessitate the machine being removed again
and transported.
Note
Note also the technical data on the rating plates on the motor enclosure.
NOTICE
Damage to the motor
To avoid material damage, before commissioning, check whether the correct direction of
rotation of the machine has been set on the customer side, e.g. by decoupling from the
driven load.