
Commissioning
7.5 Commissioning the cooling circuit
1FE1 synchronous built-in motors
128
Hardware Installation Manual, 12/2016, 610.43000.40b
7.5
Commissioning the cooling circuit
●
To prevent contamination to the cooling water pipes, flush them before you connect the
motor and the converter to the cooling circuit.
●
Commission the cooling circuit before performing the electrical commissioning.
7.6
Switching on and switching off
Note
EMERGENCY OFF
To avoid accidents, inform yourself about the EMERGENCY OFF function before you switch
on the system.
The motor is switched on and off using the converter.
●
Read about this topic in the converter operating instructions.
Before switching on
●
Ensure that the converter is correctly parameterized.
●
Use the appropriate commissioning tools, e.g. "Drive ES" or "STARTER".
●
Switch on the cooling system.
Switching on
1.
Switch-on the motor at the converter.
2.
Ensure smooth motor operation.
3.
Check the function of the motor cooling system.
4.
Check the function of the safety equipment.
5.
Check whether the motor reaches the required parameters
Switching off
●
Switch-off the motor at the converter.
The motor has been commissioned.