6.5
Inserting and routing the cables
Table 6-3
Connection technology (with cable lug / connection without cable lug)
Terminal box
Connection
GT640
1XB1621
1XB1631
1XB7730
1XB7731
1XB7740
1XB7750
6.5.1
Bringing cables into the terminal box 1XB... with sealing insert with break-off ring
The 1XB1621, 1XB1631 terminal boxes can be equipped optionally with a sealing insert with
break-off ring. The connecting cable is sealed at the cable entry location using a cut-out sealing
insert and is fastened using a strain relief device.
Bringing cables into the terminal box and connecting them
The terminal box is opened, the cable cut to the correct length and stripped back. Make sure
that no external forces are acting on the cable connection.
1P
ཱ
ི
Figure 6-8
Strain relief device and sealing insert
Proceed as follows when connecting the cables:
1. Remove the top part of the strain relief
③
and release the fixing screws for the bottom part
of the strain relief
②
. The strain relief device can be located either in the terminal box or
externally. If necessary, switch the direction sense of the strain relief device.
2. Cut the seal insert
①
so that its opening is 1 to 3 mm smaller than the diameter of the cable.
3. Pull the sealing insert over the end of the cable.
Electrical connection
6.5 Inserting and routing the cables
SIMOTICS FD 1MH1
92
Operating Instructions 08/2017
Summary of Contents for SIMOTICS FD 1LL1
Page 2: ...18 08 2017 17 24 V10 00 ...
Page 176: ...Disposal 11 4 Disposal of components SIMOTICS FD 1MH1 176 Operating Instructions 08 2017 ...
Page 178: ...Service and Support SIMOTICS FD 1MH1 178 Operating Instructions 08 2017 ...
Page 182: ...Quality documents SIMOTICS FD 1MH1 182 Operating Instructions 08 2017 ...
Page 187: ......