Preface
1.1 Preface
S7-400H
20
System Manual, 03/2012, A5E00267695-11
●
If you use long synchronization lines, you have to extend the monitoring time of the
connection at an H-CPU V6.0, see chapter Communication via fault-tolerant S7
●
The startup time of the CPU at power on, the loading time of blocks, as well mas the
startup after a plant modification at runtime can be significantly prolonged by encrypted
blocks; see chapter Encrypting blocks (Page 79).
●
The following applies to PROFINET in the fault-tolerant system: The job must be
repeated if it is rejected with return value W#16#80BA when using SFB 52/53/54.
Basic knowledge required
This manual requires general knowledge of automation engineering.
Moreover, it is assumed that the readership has sufficient knowledge of computers or
equipment similar to a PC, such as programming devices, running under the Windows XP,
Windows Vista or Windows 7 operating system. An S7-400H is configured using the STEP 7
basic software, and you should thus be familiar in the handling of this basic software. This
knowledge is provided in the
Programming with STEP 7 manual.
In particular when operating an S7-400H system in potentially explosive atmospheres, you
should always observe the information on the safety of electronic control systems provided in
the appendix of the
S7-400 Automation System, Installation manual.
Scope of the manual
The manual is relevant to the following components:
●
CPU 412–5H; 6ES7 412–5HK06–0AB0 as of firmware V6.0
●
CPU 414–5H; 6ES7 414–5HM06–0AB0 as of firmware V6.0
●
CPU 416–5H; 6ES7 416–5HS06–0AB0 as of firmware V6.0
●
CPU 417–5H; 6ES7 417–5HT06–0AB0 as of firmware V6.0
Approvals
For details on certifications and standards, refer to the
S7-400 Automation System, Module
Data manual, Section 1.1, Standards and Certifications.
Further information
For more information on the topics covered in this manual, refer to the following manuals:
Programming )
Configuring Hardware and Communication Connections with STEP 7