NOTICE
Bearing damage
The bearing insulation must not be bridged.
Damage may be caused to the bearings if there is a flow of current.
Tandem operation
If you connect two motors in series in "tandem operation", install an insulated coupling between
the motors.
①
Driving machine
④
Insulated bearings
②
Motor
⑤
Insulated tachometer fitting
③
Coupling
⑥
Insulated coupling
Figure 4-2
Schematic representation of a tandem drive
NOTICE
Bearing damage
If the coupling between the motors of the tandem drive is not insulated, bearing currents can
cause damage to the drive-end bearings of both motors.
Use an insulated coupling to link the motors.
Preparations for use
4.11 Converter operation
LOHER CHEMSTAR 1PS5
40
Operating Instructions 03/2014
Summary of Contents for SIMATIC S5 1P 243
Page 2: ...11 03 2014 02 49 V4 00 ...
Page 12: ...Introduction LOHER CHEMSTAR 1PS5 12 Operating Instructions 03 2014 ...
Page 20: ...Safety notes 2 11 Ventilation LOHER CHEMSTAR 1PS5 20 Operating Instructions 03 2014 ...
Page 66: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS5 66 Operating Instructions 03 2014 ...
Page 124: ...Disposal 11 4 Disposal of components LOHER CHEMSTAR 1PS5 124 Operating Instructions 03 2014 ...
Page 136: ...Quality documents C 4 Data LOHER CHEMSTAR 1PS5 136 Operating Instructions 03 2014 ...
Page 140: ...Index LOHER CHEMSTAR 1PS5 140 Operating Instructions 03 2014 ...
Page 141: ...AC EC Declaration of Conformity U161 AB EC Declaration of Conformity U163 AA R No 20000h U165 ...