9.7.6
Current status of the process picture...
Result
Now that you have inserted the tank, the pipes, and the labeling, your process picture should
look like the one below:
9.7.7
Adapting process pictures
Introduction
To operate and monitor the process, open the OS in SIMATIC Manager and activate the OS
project.
Configuring the operator station
9.7 Creating the process picture
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA
163