SIMATIC IPC847E
Operating Instructions, 10/2018, A5E43920357-AA
59
Commissioning the device
4
4.1
Switching on the device
Requirement
●
The power supply is connected. (Page 51)
Procedure
1.
Toggle the on-off switch (for redundant power supply: both on/off switches) on the rear of
the device (position | ).
2.
Press the on/off button at the front of the device behind the front panel door. Information
on the position of the switch and button can be found at "Operator controls (Page 23)".
Commissioning the installed Windows® operating system
You can find information on first startup of the device and commissioning the installed
Windows® operating system in the documentation on the supplied data storage medium.
See also "Important instructions and manuals for operating the device (Page 11)" for more
on this.
4.2
Configuring automatic switch-on of device
In the firmware settings you can specify that the device automatically starts up again after a
separation from the mains voltage of at least 20 ms as soon as the mains voltage is
available again.
Configure this function with the firmware setting:
●
State After G3
You can find information on this in the detailed firmware/BIOS description, see "Important
instructions and manuals for operating the device (Page 11)".
The exact minimum required downtime of the mains voltage is dependent on the device
equipment and the application.