Installation
Distributed I/O Device ET 200R
3–2
(4)J31069-D0427-U001-A2-7618
3.1
Mounting/Demounting the ET 200R
Mounting the ET 200R
•
If necessary, clean coarse soil from the base.
•
Mount the module on the 3 mounting positions on the base with Phillips screws.
Tightening moment: 2 Nm (max. of 3 Nm).
Before mounting a welding module on the Kempf box, for example, connect the
transformer signals with the plug connector in the floor opening. Make sure that
the terminal allocation is correct (see chapter 4.2.1).
Caution
Make absolutely sure that the floor seals of the module are in perfect condition.
Otherwise protection rating IP65 is no longer provided.
Demounting the ET 200R
The module is demounted in reverse order.
Dimensional drawing showing the mounting holes
The following figure shows the dimensions for the position of the holes for the
mounting screws for an ET 200R module.
Figure 3-1
Dimensions for the mounting holes