Installation
4.10 Wiring the ET200pro system
SIMATIC ET 200pro FC-2 converter
54
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257324B AF
Table 4- 3
Assignment of the main power connections on the frequency converter
Number
Connection X1
Connection X2
Connection X3
HAN Q4/2 (male)
HAN Q8/0 (female)
HAN Q4/2 (female)
1
Phase L1
U
Phase L1
2
Phase L2
Not assigned
Phase L2
3
Phase L3
W
Phase L3
4
Not assigned
Brake (-)
Not assigned
5
--
Temperature sensor (+)
--
6
--
Brake (+)
--
7
--
V
--
8
--
Temperature sensor (-)
--
PE
PE
PE
Requirements
Note
National Fire Protection Association (NFPA) compatibility
These devices are only certified for installation in industrial machines in accordance with the
"Electrical Standard for Industrial Machinery" (NFPA79).
Due to their design features, it is possible that these devices cannot be installed in
accordance with the National Electrical Code (NFPA70).
Note
It is only permissible to use temperature-resistant copper cables for at least 75 °C.