PtP coupling and configuration of CP 340
Manual, 04/2011, A5E00369892-03
87
Starting up the CP 340
3
Step sequence
Before commissioning the CP 340 you will need to perform the following operations in the
order given.
1.
Install the communication processor
2.
Configure the communication processor
3.
Assign the communication processor parameters
4.
Back up parameterization data
5.
Create a user program for the CP
Installing the communication processor
Installation of the CP comprises the integration of the CP into the rack of your automation
system.
You can find a detailed description in Section "Mounting the CP 340 (Page 89)" of this
manual.
Configuring the communication processor
The CP configuration includes its entry in the configuration table. Configure your CP using
STEP 7 software.
You can find a detailed description in Section "Configuring the CP 340 (Page 96)" of this
manual.
Assigning the communication processor parameters
Parameterizing the CP involves creating the specific parameters of the protocols and
configuring message texts for printout. Configure the CP using the Point–to–Point
Communication, Parameter Assignment user interface.
You can find a detailed description in Section "Parameterizing the Communications
Summary of Contents for SIMATIC CP 340
Page 6: ...Preface PtP coupling and configuration of CP 340 6 Manual 04 2011 A5E00369892 03 ...
Page 10: ...Table of contents PtP coupling and configuration of CP 340 10 Manual 04 2011 A5E00369892 03 ...
Page 200: ...Index PtP coupling and configuration of CP 340 200 Manual 04 2011 A5E00369892 03 ...