5 Interfaces
5.1
Overview of interfaces
The devices listed in the following overview can be connected depending on the SIGMASYS
terminal or interface.
Interface / device
1
2
3
4
SIGMASYS C
(standalone)
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT
spur operating panel
V.24
of SMC-GRPL S24230-
A501-A5 PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT spur op-
erating panel
TTY
printer, (SCI)
TTY
printer, (SCI)
SIGMASYS C
SIGMANET
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT
spur operating panel
V.24
SMC-GRPL S24230-
A501-A5 PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT spur op-
erating panel
TTY
SIGMANET
fixed assign-
ment
TTY
SIGMANET
fixed assign-
ment
SIGMASYS M
(standalone SOC)
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT
spur operating panel
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT
spur operating panel
TTY
printer, (SCI)
TTY
printer, (SCI)
SIGMASYS M
SIGMANET
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT
spur operating panel
V.24
PLAN, DIAG,
FBF-A, printer, GMA
Manager, (SCI)
SIGMAPORT spur op-
erating panel
TTY
SIGMANET
fixed assign-
ment
TTY
SIGMANET
fixed assign-
ment
SOP
S24230-F130-A1
up to A3
TTY
SIGMANET
fixed assignment
TTY
SIGMANET
fixed assignment
V.24
PLAN, DIAG,
printer,
GMA Manager,
(SCI)
SIGMAPORT
SOP-NET
S24230-F130-A1
(as of version V2.6)
V.24
PLAN, DIAG,
printer,
GMA Manager,
(SCI)
SIGMAPORT
spur operating panel
V.24
PLAN, DIAG,
printer,
GMA Manager,
(SCI)
SIGMAPORT
spur operating panel
TTY or V.24
SIGMANET
TTY or V.24
SIGMANET
Table 9: Overview of interfaces
Connections which are underlined are preferred.
A fire brigade indicator panel can be connected to the entries marked with SCI.
A SIGMASYS operating panel (SOP), SIGMANET operating panel or the GMA operating pa-
nel can be connected as a spur to the spur operating panel connection (V3.0 and later).
SIGMASYS operating panels should always be connected to SIGMASYS standalone control
and indicating panels with SIGMANET for redundancy reasons.
24 / 128
BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
Summary of Contents for SIGMASYS C
Page 4: ......
Page 30: ......
Page 38: ......
Page 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 48: ......
Page 62: ......
Page 84: ......
Page 110: ......
Page 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ......