6.2 Electrical installation
Set CEM CERT
Operating Instructions, 06/2021, A5E34491309-12
33
6.2.3
Connection of the power supply and signal lines
Route the cables for the analog and/or digital signals to the evaluation location, e. g.
sample gas computer or process control system.
Guide the cables with the cable glands into the inside of the system and guide the cables
through the cable duct to the terminals. The power and signal cables must be connected
to the following terminal strips:
•
-X3 Voltage for sample gas line and probe
•
-X99 Test terminals for analog signals to be measured
•
-X100 Messages and faults as binary signal (floating contact)
•
-X101 Analog signals
•
-X103 Signals for sample gas line and probe
Summary of Contents for Set CEM CERT
Page 1: ......
Page 2: ......
Page 8: ...Table of contents Set CEM CERT 6 Operating Instructions 06 2021 A5E34491309 12 ...
Page 44: ...Commissioning 7 2 Commissioning Set CEM CERT 42 Operating Instructions 06 2021 A5E34491309 12 ...
Page 112: ...Technical specifications Set CEM CERT 110 Operating Instructions 06 2021 A5E34491309 12 ...
Page 122: ...Appendix A 2 Returns Set CEM CERT 120 Operating Instructions 06 2021 A5E34491309 12 ...