
Set CEM CERT
Operating Instructions, 06/2021, A5E34491309-12
23
Application planning
4
4.1
Transport
Proper transport, storage, setup and installation, as well as careful operation and
maintenance, are essential for the error-free, safe and reliable operation of this system.
In particular, both the general erection and safety regulations governing work on
electrical power installations (e. g. DIN, VDE) and the regulations governing professional
use of lifting equipment and machinery and the use of personal protective gear (safety
glasses, etc.) must be observed.
The lifting eyes/transport shackles on the roof of the analysis cabinet must be used for
transporting the cabinet.
The analysis cabinet should be mounted and secured to prevent it from falling over
immediately after transport.
4.2
Checking the delivery
Each analysis cabinet is individually configured. Therefore, you should check the delivery
for completeness (correspondence with packing slip) before installation.
In the case of transport damage that can be attributed to improper handling, arrange for
a damage assessment by the shipping agent within 7 days.
Also check the following:
•
Are the surfaces of the system and its components clean and undamaged?
•
Have any lines been loosened after transport?
Summary of Contents for Set CEM CERT
Page 1: ......
Page 2: ......
Page 8: ...Table of contents Set CEM CERT 6 Operating Instructions 06 2021 A5E34491309 12 ...
Page 44: ...Commissioning 7 2 Commissioning Set CEM CERT 42 Operating Instructions 06 2021 A5E34491309 12 ...
Page 112: ...Technical specifications Set CEM CERT 110 Operating Instructions 06 2021 A5E34491309 12 ...
Page 122: ...Appendix A 2 Returns Set CEM CERT 120 Operating Instructions 06 2021 A5E34491309 12 ...