SENTRON PAC4200
Manual, 09/2008, A5E02316180B-01
85
Startup
7
7.1
Overview
Prerequisites
1.
The battery has been inserted into the battery compartment.
2.
The device has been installed.
3.
The device has been connected in accordance with the possible connection methods.
4.
The Ethernet cable has been connected.
5.
The optional expansion modules have been installed. If the SENTRON PAC4200 is to be
operated with one or with two expansion modules, the module(s) must be installed before
the SENTRON PAC4200 is started up.
Steps for starting up the device
1.
Apply the supply voltage
2.
Parameterizing the device
3.
Apply the measuring voltage
4.
Apply the measuring current
5.
Check the displayed measured values
NOTICE
Check the connections
Incorrect connection can result in malfunctions and failure of the device.
Before starting up the SENTRON PAC4200, check that all connections are correct.
Summary of Contents for SENTRON PAC4200
Page 66: ...Installation 5 4 Deinstalling SENTRON PAC4200 66 Manual 09 2008 A5E02316180B 01 ...
Page 118: ...Operator control 8 3 Special displays SENTRON PAC4200 118 Manual 09 2008 A5E02316180B 01 ...
Page 152: ...Service and maintenance 10 6 Disposal SENTRON PAC4200 152 Manual 09 2008 A5E02316180B 01 ...
Page 168: ...Dimension drawings SENTRON PAC4200 168 Manual 09 2008 A5E02316180B 01 ...
Page 252: ...Index SENTRON PAC4200 252 Manual 09 2008 A5E02316180B 01 ...