
Operating instruction
Control panel SCD 1297-K
Page 41 / 64
DOC-Nr.: b40008de3.doc
2 General
installation
Preparations for installing the LCD-monitor include the following points:
•
Removal of all packaging
•
Checking of components for damage
•
Comparison of components received with those on the delivery note
•
Connection to the computer system and power supply
•
Building into your system, bearing in mind technical and ergonomic aspects
2.1
Removing the packaging and checking individual parts
After unpacking all the delivered components, they should be checked for completeness and
for possible transport damage (visual inspection). If any deficiencies are found then please
contact the service department given on the delivery note. Have the delivery note number,
serial number and a description of the deficiency to hand.
The original packaging should be kept for future transportation.