![Siemens RUGGEDCOM WIN7014 Installation Manual Download Page 29](http://html.mh-extra.com/html/siemens/ruggedcom-win7014/ruggedcom-win7014_installation-manual_374298029.webp)
RUGGEDCOM WIN7014
Installation Guide
Chapter 2
Installing the Base Station
Connecting a PEC Type Base Station
21
•
Section 2.8.3, “Connecting an SFD Type Base Station”
•
Section 2.8.4, “Installing the Hazardous Location Kit”
Section 2.8.1
Connecting a PEC Type Base Station
To connect a PEC (copper) type base station to a power system and the network, do the following:
1. Connect the supplied Power-over-Ethernet (PoE) cable between the
DC/ETH
port on the base station and the
DC/ETH
port on the supplied power system.
5
7
3
1
2
4
6
Figure 12: PEC Wiring Scheme
1.
RUGGEDCOM WIN7014
2.
PoE Cable
3.
DC Power System
4.
AC Power Cable
5.
AC Power Supply (100 to 240 VAC)
6.
CAT5
Ethernet Cable
7.
Switch or Router
2. Tighten the base station end of the PoE cable to 4 N·m (35.4 lbf-in).
3. Connect a copper Ethernet cable between the 10/100Base-T copper Ethernet port on the power system and
a10/100Base-T copper Ethernet port on a switch or router.
Section 2.8.2
Connecting an SFA Type Base Station
To connect an SFA (optical) type base station to a power source and the network, do the following:
1. Connect the supplied Power-over-Ethernet (PoE) cable between the
DC/ETH
port on the base station and the
DC/ETH
port on the supplied power system.