
6-26
Rapidlab 1200 Operator’s Guide: Troubleshooting
02087462 Rev. V
b. Push a clot-removal line through the preheater from right to left, opposite to the
direction of sample flow, until you see the clot-removal line at the sample
connector.
Figure 6-10 Rapidlab 1200 Systems Sample Path
4. Inspect the
p
O
2
and
p
CO
2
(gas), sample ground/temperature, pH, and the reference
sensors for obstructions:
a. Remove the gas sensors one at a time and inspect each one for obstructions.
1
Preheater
2
Sample connector
CAUTION:
Do not push the clot-removal line through the gas sensors. To avoid
damaging the gas sensors, do not exert excessive pressure to the gas sensor
membranes.
Summary of Contents for Rapidlab 1200
Page 1: ...Rapidlab 1200 Systems Operator s Guide 02087462 Rev V 2010 01 ...
Page 6: ...iv Rapidlab 1200 Operator s Guide Using This Guide 02087462 Rev V ...
Page 88: ...1 68 Rapidlab 1200 Operator s Guide System Overview and Intended Use 02087462 Rev V ...
Page 126: ...2 38 Rapidlab 1200 Operator s Guide Operating the System 02087462 Rev V ...
Page 206: ...5 64 Rapidlab 1200 Operator s Guide Maintenance 02087462 Rev V ...
Page 290: ...6 84 Rapidlab 1200 Operator s Guide Troubleshooting 02087462 Rev V ...
Page 344: ...A 4 Rapidlab 1200 Operator s Guide Safety Instructions 02087462 Rev V ...
Page 354: ...B 10 Rapidlab 1200 Operator s Guide Service Ordering and Warranty 02087462 Rev V ...
Page 360: ...D 4 Rapidlab 1200 Operator s Guide Supplies 02087462 Rev V ...
Page 448: ...I 8 Rapidlab 1200 Operator s Guide Index 02087462 Rev V ...