
Rapidlab 1200 Operator’s Guide: Maintenance
5-19
02087462 Rev. V
Replacing the AutomaticQC Manifold
You need an AutomaticQC manifold for this task.
1. Press down on the left side of the AutomaticQC cartridge connector and slide
the connector to the right.
2. Select
Continue
.
3. Select
Diagnostics > Cartridges
.
4. Select
Eject R Cartridge
, remove the reagent cartridge, and set it aside.
5. Lift the front cover.
Refer to
Preparing for Maintenance Procedures
6. Remove the AutomaticQC manifold:
a. Pull the connector port cover towards you.
Figure 5-9 Connector Port and Cover
b. Push down on the pins on the manifold and pull the manifold and
connector port away.
7. Install the new AutomaticQC manifold:
a. Insert the bottom clip into the opening on the system.
1
Connector port cover
2
Cartridge connector
3
Pins
Summary of Contents for Rapidlab 1200
Page 1: ...Rapidlab 1200 Systems Operator s Guide 02087462 Rev V 2010 01 ...
Page 6: ...iv Rapidlab 1200 Operator s Guide Using This Guide 02087462 Rev V ...
Page 88: ...1 68 Rapidlab 1200 Operator s Guide System Overview and Intended Use 02087462 Rev V ...
Page 126: ...2 38 Rapidlab 1200 Operator s Guide Operating the System 02087462 Rev V ...
Page 206: ...5 64 Rapidlab 1200 Operator s Guide Maintenance 02087462 Rev V ...
Page 290: ...6 84 Rapidlab 1200 Operator s Guide Troubleshooting 02087462 Rev V ...
Page 344: ...A 4 Rapidlab 1200 Operator s Guide Safety Instructions 02087462 Rev V ...
Page 354: ...B 10 Rapidlab 1200 Operator s Guide Service Ordering and Warranty 02087462 Rev V ...
Page 360: ...D 4 Rapidlab 1200 Operator s Guide Supplies 02087462 Rev V ...
Page 448: ...I 8 Rapidlab 1200 Operator s Guide Index 02087462 Rev V ...