Preparation for use and operation
Setting up the server
14
A26361-K412-Z107-3-7619
Setting up the server
!
Do not expose the server to extreme environmental conditions (see
chapter "
"). Protect it from dust, humidity and heat.
There must be a clearance of at least 200 mm in front of and behind the
server to ensure adequate ventilation. Do not cover the ventilation areas
of the monitor and the server.
Connecting the server
!
Read the documentation about the external device before connecting it.
Do not connect or disconnect cables during a thunderstorm.
Always take hold of the actual plug body. Never unplug a cable by pulling
the cable itself!
Connect and disconnect the cables in the order described below.
Connecting cables
•
Turn off all power and equipment switches.
•
Pull all power plugs out of the grounded power outlets.
•
Plug all cables into the server and peripherals.
•
Plug all data communication cables into the utility sockets.
•
Plug all power cables into the grounded power outlets.