Preparatory work
Installation site
3
A6V11940317_en--_a
23 | 121
3 Preparatory work
This chapter contains all the instructions that must be carried out or ensured by the
customer before the system is mounted and installed.
3.1 Installation site
General guidelines
● The housings used must conform to the types listed in the documentation and
have to meet at least protection category IP 30, in accordance with
EN 60529:1991 or EN 60529:1991/A2:2000.
● The installation must have sufficient strength according to the installation
method recommended in the documentation.
● All the housing connections and settings must be accessible at access level 3.
● The system may only be mounted and installed stationary and in dry rooms.
● The system may consist of several housing units.
● If the housings are arranged separately in the fused area, all operating and
display elements that are defined as binding must be attached to a housing or
housings mounted exclusively in the immediate vicinity.
● The connections for the transmission paths and fuses must be clearly marked.
● All operating and display elements must be clearly labeled to indicate their
intended use.
● The labels must be readable at a distance of 0.8 m at an ambient illumination
level of 100
lx…500 lx.
● A wall which can support heavy loads should be selected. The maximum
weight, with 100 Ah batteries, is about 140 kg.
● The housings must be positioned in a way that ensures the clear escape routes
and access routes. This also applies to open cabinet doors.
● A minimum distance of 1 m from the nearest door frame is recommended.
3.2 Delivery units
The cabinet is delivered on a Euro pallet.
WARNING
High weight and incorrectly dimensioned transport methods
Severe accidents due to tipping
● Choose suitable transport methods.
● Secure the delivery unit to prevent it from tipping.
● Check that the delivery units are complete according to the details for ordering.