Initial start up of the SF 500 consists of several stages, and assumes that the physical and
electrical installation of the solids flowmeter is complete:
• power up
• programming
• load cell balancing
• zero and span calibration
Power Up
Upon initial power up, the SF 500 displays:
Programming
Press
The SF 500 then scrolls sequentially through the start up program as parameters P001
through P017 are addressed.
Press
Press
Notes:
•
For successful start up, ensure that all related system components such as the
flowmeter are properly installed and connected.
•
Ensure that the SW1 is in the normal position, to the right. (See Layout diagram on
page 7)
P001 Language
V
1-Eng
1
P002 Test Reference Selection
V
Select 1-Weight, 2-Ecal
1
P003 Number of Load Cells
V
Enter (1 or 2)
1
P004 Rate Measurement System
V
Select 1-Imperial, 2-Metric
2
The initial display prompts the user
to select the preferred language.
e.g. Accept ’weight’ (supplied with
scale) as the test reference.
e.g. Accept ’1’ as the number of load
cells.
e.g. Accept ’2’ for measurements in
metric.