![Siemens LOHER CHEMSTAR 1PS2 Operating Instructions And Installation Download Page 37](http://html.mh-extra.com/html/siemens/loher-chemstar-1ps2/loher-chemstar-1ps2_operating-instructions-and-installation_378987037.webp)
4.13.10.4
Regreasing roller bearings after storage periods of between two and four years
● For machines with regreasing system, lubricate machines immediately after commissioning
while the machine is running with approximately twice the grease quantity. This causes the
old grease to be spun out.
● Then regrease the bearings with the amount of bearing grease specified on the lubricant
plate.
Note
Increased bearing noise
Increased bearing noise can occur while the bearings are being run in The bearing noise is
not dangerous, if the operating temperature has not yet been reached and the noise is caused
by the viscosity and the dynamic viscosity of the bearing grease.
4.13.10.5
Releasing the rotor shipping brace before commissioning
If one is being used, release the rotor shipping brace before commissioning.
Preparations for use
4.13 Transport and storage
LOHER CHEMSTAR 1PS2
Operating Instructions 08/2016
37
Summary of Contents for LOHER CHEMSTAR 1PS2
Page 2: ...04 08 2016 11 45 V3 00 ...
Page 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Page 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Page 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Page 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Page 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Page 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Page 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...