DANGER
Standing under suspended loads
If the lifting gear or load handling attachments were to fail, the machine could fall. This can
result in death, serious injury or material damage.
Never remain under or in the immediate vicinity of the machine when it is raised.
Note
Store the rotor locking device
Be sure to store the rotor locking device. It must be remounted for possible disassembly and
transport.
4.13.5
Storage for up to two years
4.13.5.1
Storage conditions
● Store the machines in a dry, dust-free room where the temperature is controlled. Special
packing is therefore not necessary. In all other cases, pack the machines in a plastic film
with a substance that absorbs moisture, e.g. Branogel, or in hermetically sealed welded
foil. Use a protective cover to protect against sun and rain.
● Store the machines only in vibration-free rooms in order to avoid consequential damage to
the bearings due to vibration at standstill.
● For machines with closed condensation water drain holes, check whether there is any
condensation and if so, drain it. Then reseal the drain holes.
WARNING
Risk of explosion due to damaged sealing materials
Storing the machine at temperatures that do not fall within the specified limits can damage
the material of the seals and cause them to fail. As a result, a potentially explosive gaseous
atmosphere can enter the machine and be ignited during commissioning. Explosions can
occur. This can result in death, serious injury or material damage.
The materials used are specially designed for the temperature range required by the
customer. Do not store the motor in conditions that lie outside the specified temperature limits.
The relevant temperature limits are specified on the rating plate.
4.13.5.2
Commissioning
● Remove the moisture-absorbing substance, such as Branogel, from the terminal boxes
before commissioning.
Preparations for use
4.13 Transport and storage
LOHER CHEMSTAR 1PS2
Operating Instructions 08/2016
33
Summary of Contents for LOHER CHEMSTAR 1PS2
Page 2: ...04 08 2016 11 45 V3 00 ...
Page 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Page 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Page 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Page 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Page 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Page 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Page 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...