![Siemens IONPURE VNX50HH-2 Operation & Maintenance Manual Download Page 6](http://html.mh-extra.com/html/siemens/ionpure-vnx50hh-2/ionpure-vnx50hh-2_operation-and-maintenance-manual_377179006.webp)
IONPURE
®
VNX50HH-2 CEDI Modules
Page 6
IP-MAN-VNX50HH2
1.2. Using this manual
Service technicians should review this manual prior to going to the site. It
lists tools and materials needed to install the modules. It also outlines the
site information required to prepare for installation.
NOTE:
The warranty may be void if installation or operation instructions contained in this manual are not
followed exactly.
This Manual describes the installation, operation, and routine maintenance of the VNX50HH-2 modules.
It also contains information on basic troubleshooting (Section 7).
IONPURE strongly recommends all users read the entire contents of the manual. If the VNX50HH-2
module is not operating properly after going through the basic troubleshooting exercises, contact your
Local Service Provider.
1.3. Installation Precautions
•
DO NOT OPEN THE VNX MODULE. OPENING THE MODULE WILL VOID
THE WARRANTY AND CAUSE IRREVERSIBLE DAMAGE
•
During operation, the electrode wiring inside the module junction boxes are at high voltage and
present a shock hazard. THEREFORE, BEFORE TOUCHING THE INSIDE OF THE JUNCTION
BOX, CONFIRM THAT AC POWER HAS FIRST BEEN DISCONNECTED AND LOCKED OUT
ACCORDING TO STANDARD LOCKOUT/TAGOUT PROCEDURES.
•
To eliminate the possibility of electric shock, confirm that all GROUND WIRES ARE PROPERLY
CONNECTED. Thoroughly read all the information in this manual before operating the VNX model
modules.
•
THE MODULE MUST BE OPERATED ACCORDING TO THE DESIGN SPECIFICATIONS FOR
TEMPERATURE AND HUMIDITY.
•
IMPORTANT - Pipe sections prepared for installation must be inspected, and be free of debris from
storage or cutting tool particles. This must be done before installation.
•
IMPORTANT - Because VNX modules have narrow flow distribution channels, plugging by particles
can cause permanent damage. Always install pressure gauges, sampling ports, sensors, etc. in tee
fittings. Do not drill or tap into piping. After installing gauges, sampling ports, sensors, etc., always
flush out the piping before connecting to the VNX module to remove any debris.
•
Installation of the VNX module must be completed in accordance with the procedures outlined in this
manual. If deviations from the prescribed procedures are deemed necessary to achieve the desired
performance, consult your local Service Provider.
1.4. Operating Precautions
•
DO NOT APPLY POWER TO THE VNX MODULE UNTIL PROPER FLOW AND PRESSURE HAVE
FIRST BEEN CHECKED AND VERIFIED.
•
Allow for proper inlet and outlet connections. NEVER BLOCK OFF (DEAD-HEAD) ALL OF THE VNX
OUTLET pipe connections. Dead-heading by blocking all outlets can result in over-pressurization,
leading to permanent damage.