![Siemens IM 153-4 PN Operating Instructions Manual Download Page 65](http://html.mh-extra.com/html/siemens/im-153-4-pn/im-153-4-pn_operating-instructions-manual_377175065.webp)
Installation
4.2 Installation
ET 200M
Operating Instructions, 12/2008, EWA-4NEB780600602-08
63
Connection of protective conductor
The following figure shows you how to connect the protective conductor to the rail.
Figure 4-2
Connecting the protective conductor to the rail
See also
Clearance Measurements (Page 41)
4.2.3
Installing modules on the mounting rail (standard installation)
Accessories
The accessories you need for installation are included with the modules. The appendix
"Order Numbers for ET 200M (Page 247)" contains a list of accessories and spare parts with
the corresponding order numbers.
Table 4- 2
Module accessories
Module
Included accessories
Description
IM 153-x
1 x slot number label
For assigning slot numbers
Bus connectors
For establishing the electrical connections between the
modules
Signal module
(SM)
Labeling strip
For labeling the input and output points on the module
Summary of Contents for IM 153-4 PN
Page 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...