Mounting / Installation
Installation
5
38 | 62
Building Technologies
009757_f_en_--
Fire Safety
2016-08-23
Manual call point FDM226
Observe the country-specific regulations for the exact installation height!
The manual call point FDM226 is prepared for installation. See the chapter
1. Pull the cables through the entry opening(s) into the back box. Use metal cable
glands M20 x 1.5 (accessories) with metal counter nuts (accessories).
2. Using the fastening tabs, secure the back box at a height of 0.9…1.6 m on an
even surface.
The manual call point FDM226 is now prepared for electrical connection.
Figure 16: Installation of manual call point FDM226