7 Installation and Commissioning
7.1 Installing the hardware
HCS4x00Library
Entry ID: 109478117, V2.2.1, 09/2018
62
S
ie
m
e
n
s
A
G
2018
A
ll r
ig
h
ts
r
e
s
e
rv
e
d
7
Installation and Commissioning
In this chapter, the necessary steps are described for commissioning the example
project with the hardware and software used (from chapter
7.1
Installing the hardware
The figure below shows the hardware setup of the application.
Figure 7-1
S7-1500
SIPLUS HCS4200
PC/PG
PROFINET IE
Radiant heater panels
STEP 7
(TIA Portal)
X3.+
24 V DC
X3.-
L2
X1
X3
X1.1
X1.2
X1.3
X1.4
X3.1
X3.2
X3.3
L+ M
24 V DC
X1
P1R P2R
CIM4210
PROFINET
V2.2
POM4220
HIGHEND
IP address: 192.168.0.1
Subnet: 255.255.255.0
IP address: 192.168.0.242
Subnet: 255.255.255.0
IP address: 192.168.0.2
Subnet: 255.255.255.0
L1
X3.4
N
N
Parallel connection of 2
heating elements at channel 1