![Siemens ASIC SIM 1-2 Function Manual Download Page 59](http://html.mh-extra.com/html/siemens/asic-sim-1-2/asic-sim-1-2_function-manual_377074059.webp)
SIM 1-2
C79000-G8976-C215-01
59
Putting into Operation
5
5.1
Putting into Operation for the First Time
Description
Before putting into operation for the first time, check the correct wiring and
components according to the block diagrams. In particular, check the reference
resistances R
RIREF
, R
RISOLL
, R
RVCCVE
and R
RVREG
and the connection VE/VESRD and
the connection VCCA/VCCD.
Caution
An interruption at the reference resistances R
RIREF
and R
RISOLL
during operation can
lead to damage/destruction of the SIM 1-2.
Summary of Contents for ASIC SIM 1-2
Page 6: ...Preface SIM 1 2 6 C79000 G8976 C215 01 ...
Page 44: ...Technical Specifications SIM 1 2 44 C79000 G8976 C215 01 ...
Page 46: ...Application Examples SIM 1 2 46 C79000 G8976 C215 01 ...
Page 50: ...Application Examples SIM 1 2 50 C79000 G8976 C215 01 Signal Evaluation in the Demodulator ...
Page 58: ...Application Examples SIM 1 2 58 C79000 G8976 C215 01 ...