Air sampling smoke detection system
AD1-C11
Quick Guide for Commissioning
1 Installation
§
Connect power (24VDC)
§
Connect the detector line
§
Connect reset input (if S1 = ON)
§
Install the detector base and the smoke detector
§
Connect pipe system or test pipe
2 Set
Up
Set DIP switches S1 and S2 on pcb E573 according to tables below:
Air flow monitoring
switch
S2
delay time
switch
S2
range
A
B
C
D
OFF
ON
short
30 s
ON
OFF
small
I
ON
OFF
middle
2 min.
(standard)
OFF
ON
middle
II
ON
ON
long
16 min.
OFF
OFF
large
III
(standard)
OFF
OFF
very
long
128 min.
Fault
switch S1
OFF
Fault not latching
(standard)
ON
Fault latching until reset
3 Commissioning
Adjustment of the Air Flow Sensor
1.
Fix cover and tighten screws
2.
The unit must be in operation for at least 5 minutes
3.
Adjustment with adjusting peg to
0V +- 15 mV
or according to the air pressure adjustment
chart
4.
Unit ready