7 | Installation
66/174
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
Fig. 56:
Mounting the front cover to the
panel with low-voltage compartment
Fig. 57:
Mounting the front cover on the
metering panel
1
Front cover
3
Support
2
Retaining bracket
7.13.4 Mounting the lateral parts
1. Fasten the lateral parts at the left and right upper edge of the switchgear roof plate using
2 bolts M5 each. Bolt together with the respective front cover using one bolt M8.
Fig. 58:
Fixing points of the lateral parts
Fig. 59:
Lateral parts mounted (view from
the rear)
1
M6 bolt with plastic washer
3
Lateral part
2
Bolt M8
4
Bolt M5 (2x)
7.13.5 Mounting the absorber collar
INFORMATION
If a panel group consisting of 2 panels is wider than 620 mm, there will be a gap on the right
side between the absorber collar and the lateral part. In this case, fasten the right-hand
absorber collar only at the fixing points located at the rear of the pressure relief duct.
▪ To close the gap, mount offset plates between the right-hand absorber collar and the
lateral part.
If there are voltage transformers mounted on the busbar, the right-hand absorber
collar cannot be mounted.