
4
Commissioning
4.1
General requirements
Before commissioning it must be checked that:
●
The device has been installed and connected in accordance with the guidelines provided
in chapter 2 Installing/mounting (Page 13) and 3 Connecting (Page 23).
●
Device installed in hazardous location meets the requirements described in chapter 1
Safety Notes (Page 6).
4.2
Commissioning
DANGER
Electrical Shock Hazard
Certain parts inside the device carry dangerous high voltage and will cause death or
serious injury.
The transmitter must be grounded and the top cover closed before switching the device on.
Turn off main power before installing AC connections to the transmitter.
CAUTION
Power Supply Damage
Improper power connections will damage power supply and may result in death or serious
injury.
Ensure that all AC or DC power supply connections are properly connected to the
appropriate power source (100-250 VAC @ 50/60 Hz or 9-36 VDC).
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 1/2013, A5E02639182-AC
35