
Wiring 2-path systems
Figure 5-3
Wiring transducer cables, 2-path system
5.2
Wiring output and power supply
①
Lid of terminal box
②
Cable gland
③
PE connector - between the cable glands (please connect this PE connedtor)
Figure 5-4
FUS060 with lazed cables
1. Release the lid of the terminal box by turning the 3 mm hexagon socket screw
2. Unscrew the lid.
3. Push the power cable and signal cable through the cable glands up to the terminal block.
Connecting
5.2 Wiring output and power supply
SITRANS FUS060 with PROFIBUS PA
Operating Instructions, 09/2021, A5E02225054-AD
35