Product Description 

These instructions explain how to field install or 
replace a CE Compliant Dual Duct Controller — Two 
Air Velocity Sensors — Electronic Output with or 
without Autozero Modules.  

Shipping carton includes a controller assembly 
(controller board and cover), a mounting rail, Autozero 
Modules with brackets (optional), and two self-tapping 
screws.  

For CE compliance, ferrite filter(s) and an alternate 
room sensor cable must be used (see 

Product 

Numbers).

  

NOTE: 

Keep the controller assembly in its static-proof 
bag until installation. 

Product Numbers 

Product Description 

550-506 

Dual Duct Controller — Two Air Velocity 
Sensors — Electronic Output 

550-507 

Dual Duct Controller — Two Air Velocity 
Sensors — Electronic Output with Autozero 
Modules 

588-100A 

25-ft  (7.6-m) 

588-100B 

50-ft  (15.2-m) 

588-100C 

2-RJ11 room 
temperature 
sensor cable 

100-ft  (30.48-m) 

550-705 

clamp-on ferrite filter 10 pack 

 

Caution Notation 

CAUTION: 

 

 

Equipment damage or loss of 
data may occur if the user 
does not follow procedure as 
specified. 

 

Required Tools 

• 

Electro-Static Discharge (ESD) wrist strap 

• 

Small flat-blade screwdriver 

• 

Medium flat-blade screwdriver 

• 

Medium-duty electric drill 

• 

1/4-inch (6.35 mm) hex nut bit 

• 

Portable Operator’s Terminal with Controller 
Interface Software (CIS) Rev. 2.0 or higher 
(controller replacement only) 

Additional tools needed if not using self-tapping 
option: 

• 

1/4-inch (6.35 mm) hex nut driver 

• 

1/8-inch (3 mm) bit 

Prerequisites 

• 

Room temperature sensor installed (optional) 

• 

Air velocity sensors installed in ducts 

• 

24 Vac Class 2 power source 

• 

Supply power to the unit is OFF 

• 

Autozero Modules with brackets are on hand 
(optional) 

• 

If required, controller enclosure installed 

Expected Installation Time 

New controller installation 

10 min. 

Replacement with removable terminal 
blocks 

6 min. 

Replacement without removable 
terminal blocks 

16 min. 

NOTE: 

You may require additional time for 
database work at the field panel. 

 

Summary of Contents for 550-506

Page 1: ...50 ft 15 2 m 588 100C 2 RJ11 room temperature sensor cable 100 ft 30 48 m 550 705 clamp on ferrite filter 10 pack Caution Notation CAUTION Equipment damage or loss of data may occur if the user does not follow procedure as specified Required Tools Electro Static Discharge ESD wrist strap Small flat blade screwdriver Medium flat blade screwdriver Medium duty electric drill 1 4 inch 6 35 mm hex nut ...

Page 2: ... 6 or No 8 screws 3 Place the ESD wrist strap on your wrist and attach it to a good earth ground 4 Carefully remove the controller assembly from the anti static bag Center it over the mounting rail and snap it securely into place 5 Connect the Floor Level Network FLN See Figure 4 6 Connect the point wiring as shown in Figure 7 NOTE Wiring to DI3 AI3 requires a clamp on ferrite filter Figure 6 Stra...

Page 3: ...ield panel If the old controller does not communicate with the field panel but communicates with CIS or is stand alone record the initial values in Table 1 If the old controller is not communicating or has a newer firmware revision use the following steps to update the field panel a Obtain a field panel Point Definition Report for the LCTLR point Record the values in Table 1 b View the initial val...

Page 4: ... the new controller the field panel will automatically send the initial values down to the new controller Once this takes place replacement is complete If you manually recorded the initial values in the table then enter them into the new controller If a field panel is present then update the controller s initial values Replacement is complete If there was no communication at the old controller or ...

Page 5: ...ARENTHESES 4 1 8 105 10 29 32 277 3 16 5 TEC0319R1 C L 11 9 32 287 1 27 32 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 S Figure 3 Mounting Dimensions FLN TRUNK RX TX S BST RTS SHIELD SHIELD TEC0272R2 NOTE DO NOT ground the shield 24 V AC H C GND DO1 DO2 DO3 DO4 DO5 NO C NO C NO C NO C NO C NO 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 1 COMMON 24 VAC HOT EARTH GND CONTROLLER POWE...

Page 6: ...or point wiring for AI3 DI3 approximately 1 cm from the end 2 Wind the cable tightly twice around the filter 3 Close the filter and wrap it with a zip tie covering wound cable Figure 6 Adding Ferrite Filter s for CE Compliance CAUTION Ferrite filter s must be installed on the room temperature sensor RTS cable and any wiring to AI3 DI3 If not the controller is not CE compliant ...

Page 7: ... 2 DO 7 NO C DO 8 NO C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 C H GND S E H C Y1 G Y2 CW COMMON CCW COLD DUCT DAMPER ACTUATOR Y1 G Y2 CW COMMON CCW HOT DUCT DAMPER ACTUATOR ELECTRIC HEAT STAGE 2 OPTIONAL OR SPARE DO ELECTRIC HEAT STAGE 1 OPTIONAL OR SPARE DO AVS 2 AUTOZERO MODULE OPTIONAL OR SPARE DO Figure 7 Point Wiring for Applications 2237 2238 2267 and 2268 with Electric Reheat 1 ...

Page 8: ... 12 13 14 15 16 17 18 19 20 C H GND S E H C Y1 G Y2 CW COMMON CCW COLD DUCT DAMPER ACTUATOR Y1 G Y2 CW COMMON CCW HOT DUCT DAMPER ACTUATOR ELECTRIC HEAT STAGE 2 OPTIONAL OR SPARE DO ELECTRIC HEAT STAGE 1 OPTIONAL OR SPARE DO AVS 2 AUTOZERO MODULE OPTIONAL OR SPARE DO DUCT TEMPERATURE SENSOR 100K THERMISTOR OPTIONAL Figure 9 Point Wiring for Application 2269 with Electric Reheat 1 2 3 4 5 6 7 8 9 1...

Page 9: ...IL 60089 4513 U S A Your feedback is important to us If you have comments about this document please send them to technical editor sbt siemens com Document No 550 308 Printed in the U S A Page 9 NOTE Record only those points marked with an asterisk on the CIS display Use F3 Look to identify the initial value for each point marked with an asterisk You may want to make extra copies of this table for...

Reviews: